Implementing monitoring for performance evaluation
Our staff utilizes the WRAMP framework to conduct monitoring to evaluate project performance for a variety of stream and wetland restoration/mitigation projects. We work collaboratively with project partners to select the appropriate set of monitoring methods to answer project-specific questions and evaluate overall performance. Monitoring typically includes both standardized, statewide methods, as well as specialized methods for site-specific aspects of habitat or geomorphic function.
The California Rapid Assessment Method (CRAM) is a powerful tool for assessing the overall ecological condition of a stream or wetland. It is a rapid, cost-effective method that is easily included in site monitoring. CRAM provides a “common language” to compare condition across space and time. The data provide a high-level overall snapshot of condition, and detailed data that can inform project design, adaptive management, or trigger additional, more detailed monitoring if needed. More about CRAM.
Restoration or mitigation projects are typically implemented to benefit a specific species or habitat type. These goals result in required monitoring of the quantity and/or quality of habitat to understand if the project is successful. For example, measuring physical characteristics and water temperature to assess salmon habitat in streams, or monitoring tree cover to quantify the amount of riparian habitat. Monitoring results, combined with qualitative observations, provide a holistic view of the habitat provided by the project
We provide a variety of geomorphic monitoring to assess the geomorphic processes and functioning of streams or wetlands. Data collection is tailored to each individual project, and might include channel cross sectional and longitudinal profile surveys, quantification of the bed grain size distribution, quantification of sediment transport processes, large wood inventory, or identification of reach/regional scale geomorphic processes. This monitoring focuses upon the physical processes and drivers at both the site and the landscape/watershed scale.
Featured Projects
Recent Publications
Lake Silveira CRAM Assessments: Mitigation Monitoring Report Post-Construction - Year 5 (2025)
The Santa Clara Valley Water District’s (Valley Water) Upper Llagas Creek Flood Protection Project (Project) aims to increase flood protection within the City of Morgan Hill and surrounding unincorporated areas. Project…