Continuous water monitoring at Station B (discharge from San Luis Drain), November 2007

Show explanation of footnotes and agency abbreviations
PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
15
18.2
P
3,620
13.5
1.1
Nov-02-2007
15
17.8
P
3,590
18.8
1.5
Nov-03-2007
15
17.5
P
3,960
23.2
1.9
Nov-04-2007
15
17.2
P
4,050
27.8
2.3
Nov-05-2007
16
17.1
P
3,570
27.8
2.3
Nov-06-2007
18
17.0
P
3,400
23.7
2.3
Nov-07-2007
18
17.1
P
3,660
20.5
2.0
Nov-08-2007
18
17.0
P
3,670
22.2
2.2
Nov-09-2007
21
16.9
P
3,740
19.6
2.2
Nov-10-2007
23
16.7
P
3,820
22.0
2.7
Nov-11-2007
22
16.9
P
4,210
21.8
2.6
Nov-12-2007
20
15.5
P
4,360
27.7
3.0
Nov-13-2007
22
15.8
P
4,350
37.7
4.4
Nov-14-2007
20
16.3
P
4,260
55.1
5.9
Nov-15-2007
18
16.6
P
4,480
63.3
6.3
Nov-16-2007
16
16.9
P
4,240
51.4
4.4
Nov-17-2007
17
16.6
P
4,200
40.8
3.7
Nov-18-2007
17
16.5
P
4,130
44.9
4.2
Nov-19-2007
17
16.6
P
3,960
45.6
4.2
Nov-20-2007
16
15.4
P
3,770
37.3
3.3
Nov-21-2007
17
13.9
P
3,460
22.6
2.1
Nov-22-2007
17
13.1
P
3,530
20.3
1.9
Nov-23-2007
18
12.3
P
3,550
21.7
2.1
Nov-24-2007
20
11.7
P
3,500
19.8
2.2
Nov-25-2007
21
11.5
P
3,580
23.5
2.7
Nov-26-2007
21
11.5
P
3,960
29.8
3.4
Nov-27-2007
21
11.5
P
4,030
33.4
3.7
Nov-28-2007
19
11.0
P
4,300
42.2
4.3
Nov-29-2007
18
10.9
P
4,260
52.7
5.2
Nov-30-2007
17
10.8
P
4,250
60.2
5.7
Mean
18
15.1
P
3,920
32.4
3.2
Total Acre-feet
1,090
 
Total (lbs)
96
Load Limitation for November (lbs)
219