Copper (Cu) concentrations in sediment in parts per million, dry weight (ppm) at 24 stations sampled in February and August of 1997. * indicates coarse sediment stations. Data is not shown for a number of sites because the blanks were contaminated (as indicated by B). b= blank contamination <10% of measured concentration. Copper concentrations ranged from 9.9 to 67.7 ppm The highest concentration was sampled at Pinole Point (BD31) in February and the lowest at Davis Point (BD41) in August. Average concentrations were highest (60.0 ppm) in the Northern Estuary in February and lowest (14.2 ppm) in the Rivers in August. All stations had concentrations below the ERM value of 270 ppm However, fifteen stations in February and sixteen stations in August had concentrations above the ERL value of 34 ppm.
 