RMP TRC Meeting
Date:
Tue, 09/18/2012 10:00am – 3:00pm The TRC discussed the status of the RMP 2012 Annual Meeting and previewed two Annual Meeting Presentations. Updates and highlights from the "Conceptual Model of Contaminant Fate on the Margins of San Francisco Bay" and the "Conceptual Foundations for Modeling Bioaccumulation in San Francisco Bay" reports were presented. An overview of the Nutrient Conceptual Model and Nutrient Loading Study was given, including a revised timeline for the draft report's release. To conclude, results from the California Mussel Watch CEC Pilot study were shared.
| Attachment | Size |
|---|---|
| Agenda Final.doc.pdf | 298.36 KB |
| Item 1 TRC Meeting summary.pdf | 502.85 KB |
| Item 1 TRC Action Items.pdf | 191.82 KB |
| Item 2 SC Meeting summary.pdf | 554 KB |
| Item 2 SC Action Items.pdf | 201.1 KB |
| Item 3 Annual Meeting Agenda.pdf | 160.58 KB |
| Item 11 Workgroup Updates.pdf | 452.5 KB |
| Item 11 Scorecard.pdf | 192.81 KB |
| compiledTRCmeetingpresentations_9_18.pdf | 5.67 MB |
| TRCmeeting_9_18_summaryv3.pdf | 838.25 KB |