GBP Home
Station B
PDF Reports
Data Files
Overview
SFEI
Continuous water monitoring at Station B
(discharge from San Luis Drain),
January 2006.
< Back
PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
36
11.7
7.3
4,310
54.7
10.7
Jan-02-2006
46
11.4
6.6
4,200
51.8
12.8
Jan-03-2006
81
11.4
6.4
4,160
54.9
24.1
Jan-04-2006
109
11.6
5.4
3,300
41.4
24.4
Jan-05-2006
114
11.8
2.8
2,140
25.2
15.5
Jan-06-2006
86
11.8
3.2
2,400
27.6
12.8
Jan-07-2006
75
12.2
4.0
2,780
29.2
11.8
Jan-08-2006
67
12.2
6.2
3,550
36.4
13.2
Jan-09-2006
56
12.0
6.5
3,830
44.4
13.3
Jan-10-2006
51
12.0
7.1
4,320
53.0
14.6
Jan-11-2006
51
11.9
8.2
4,730
58.4
16.2
Jan-12-2006
53
11.4
8.2
4,840
60.8
17.2
Jan-13-2006
52
11.6
8.1
4,870
68.6
19.3
Jan-14-2006
53
11.8
8.1
4,800
67.5
19.2
Jan-15-2006
52
11.3
8.1
4,780
71.4
20.1
Jan-16-2006
50
10.9
9.6
5,130
82.7
22.5
Jan-17-2006
47
10.9
8.0
4,890
74.2
18.9
Jan-18-2006
47
11.1
8.5
4,890
76.2
19.3
Jan-19-2006
48
10.6
8.5
4,970
75.4
19.4
Jan-20-2006
48
10.4
7.8
4,950
74.2
19.1
Jan-21-2006
48
10.5
8.7
4,880
67.7
17.4
Jan-22-2006
44
10.7
8.7
4,870
72.6
17.2
Jan-23-2006
41
10.5
8.7
4,960
78.5
17.3
Jan-24-2006
41
10.7
9.0
4,920
68.2
15.0
Jan-25-2006
44
10.8
8.3
4,980
70.6
16.6
Jan-26-2006
46
11.5
8.5
4,910
70.3
17.3
Jan-27-2006
45
11.3
7.8
4,960
64.3
15.6
Jan-28-2006
44
11.7
7.8
4,800
63.4
15.0
Jan-29-2006
42
12.8
8.0
4,830
63.8
14.6
Jan-30-2006
41
13.1
8.0
4,900
68.7
15.2
Jan-31-2006
42
13.0
7.4
4,920
66.8
15.0
Mean
55
11.5
7.4
4,440
60.7
16.8
Total Acre-feet
3,370
 
Total (lbs)
521
Load Limitation for January 2006 (lbs)
211

Compiled by San Francisco Estuary Institute
comments? nicole@sfei.org