GBP Home
Station B
PDF Reports
Data Files
Overview
SFEI
Continuous water monitoring at Station B
(discharge from San Luis Drain),
January 2003 .
< Back
PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
26
10.0
7.1
4,370
57.2
8.0
Jan-02-2003
27
10.4
7.3
4,350
38.9
5.7
Jan-03-2003
24
10.3
7.3
4,430
32.9
4.3
Jan-04-2003
21
10.3
7.4
4,470
31.4
3.6
Jan-05-2003
28
10.8
7.8
4,560
34.6
5.2
Jan-06-2003
26 e
11.2
7.7
4,680
60.8
8.5
Jan-07-2003
28 e
10.5
7.7
4,560
66.7
10.1
Jan-08-2003
28 e
10.1
8.1
4,620
78.5
11.9
Jan-09-2003
23
10.0
8.3
4,770
84.2
10.4
Jan-10-2003
24
10.4
8.4
4,740
90.1
11.7
Jan-11-2003
27
11.0
7.7
4,580
87.7
12.8
Jan-12-2003
27
11.2
8.4
4,700
73.5
10.7
Jan-13-2003
24
11.2
8.0
4,690
69.3
9.0
Jan-14-2003
24
11.6
8.0
4,680
79.8
10.3
Jan-15-2003
23
12.0
7.8
4,700
77.6
9.6
Jan-16-2003
20
11.6
9.1
4,760
78.4
8.5
Jan-17-2003
19
11.4
8.5
4,660
72.7
7.4
Jan-18-2003
15
11.2
8.6
4,600
68.5
5.5
Jan-19-2003
15
10.8
8.5
4,660
69.8
5.6
Jan-20-2003
20
10.4
8.4
4,670
69.4
7.5
Jan-21-2003
20
10.4
8.2
4,570
66.0
7.1
Jan-22-2003
21
10.6
8.0
4,480
51.2
5.8
Jan-23-2003
22
11.4
8.1
4,350
34.4
4.1
Jan-24-2003
23
12.0
7.8
4,370
36.0
4.5
Jan-25-2003
20
11.8
8.9
4,690
32.9
3.5
Jan-26-2003
19
12.1
8.6
4,620
52.3
5.4
Jan-27-2003
18
12.2
8.5
4,620
45.3
4.4
Jan-28-2003
21
12.8
7.5
4,490
41.7
4.7
Jan-29-2003
20
13.2
7.9
4,490
45.5
4.9
Jan-30-2003
24
13.1
7.6
4,500
44.2
5.7
Jan-31-2003
26
13.2
P
4,810
50.7
7.1
Mean
23
11.3
8.0
4,590
58.8
Total Acre-feet
1,390
 
Total (lbs)
224
Load Limitation for January 2003 (lbs)
359

Compiled by San Francisco Estuary Institute
comments? nicole@sfei.org