Continuous water monitoring at Station B (discharge from San Luis Drain), July 2008

Show explanation of footnotes and agency abbreviations
PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
19
26.7
P
3,650
26.6
2.7
Jul-02-2008
19
26.6
P
4,000
26.5
2.8
Jul-03-2008
22
26.6
P
3,990
26.9
3.2
Jul-04-2008
21
26.9
P
4,030
29.5
3.4
Jul-05-2008
22
26.8
P
4,200
33.6
4.0
Jul-06-2008
21
27.0
P
4,230
31.5
3.5
Jul-07-2008
18
27.5
P
4,240
32.3
3.1
Jul-08-2008
19
29.0
P
4,300
32.6
3.3
Jul-09-2008
20
30.0
P
4,330
30.6
3.4
Jul-10-2008
19
30.5
P
4,450
20.9
2.2
Jul-11-2008
20
29.5
P
4,040
30.6
3.2
Jul-12-2008
20
29.2
P
4,570
38.2
4.0
Jul-13-2008
21
28.8
P
4,340
30.8
3.4
Jul-14-2008
22
29.0
P
3,910
22.6
2.6
Jul-15-2008
19
28.7
P
4,070
23.9
2.5
Jul-16-2008
18
28.2
P
3,860
19.2
1.9
Jul-17-2008
18
28.0
P
3,630
16.1
1.5
Jul-18-2008
16
27.5
P
3,740
15.1
1.3
Jul-19-2008
16
27.4
P
3,410
16.6
1.4
Jul-20-2008
16
27.2
P
3,640
21.0
1.8
Jul-21-2008
16
26.8
P
4,120
17.5
1.5
Jul-22-2008
16
26.1
P
4,070
15.1
1.3
Jul-23-2008
16
26.0
P
3,900
14.7
1.3
Jul-24-2008
18
26.8
P
3,860
17.1
1.6
Jul-25-2008
18
27.3
P
4,520
23.0
2.3
Jul-26-2008
18
27.2
P
4,460
22.1
2.1
Jul-27-2008
17
27.0
P
4,310
25.4
2.3
Jul-28-2008
16
27.1
P
4,440
25.0
2.2
Jul-29-2008
18
27.2
P
4,460
25.9
2.5
Jul-30-2008
16
26.6
P
4,220
27.8
2.4
Jul-31-2008
16
27.1
P
4,240
27.5
2.4
Mean
18
27.6
P
4,100
24.7
2.5
Total Acre-feet
1,130
 
Total (lbs)
77
Load Limitation for July (lbs)
171