Continuous water monitoring at Station B (discharge from San Luis Drain), January 2006.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
36
11.7
7.3
4,310
54.7
10.7
Jan-02-2006
46
11.4
6.6
4,200
51.8
12.8
Jan-03-2006
81
11.4
6.4
4,160
54.9
24.1
Jan-04-2006
109
11.6
5.4
3,300
41.4
24.4
Jan-05-2006
114
11.8
2.8
2,140
25.2
15.5
Jan-06-2006
86
11.8
3.2
2,400
27.6
12.8
Jan-07-2006
75
12.2
4.0
2,780
29.2
11.8
Jan-08-2006
67
12.2
6.2
3,550
36.4
13.2
Jan-09-2006
56
12.0
6.5
3,830
44.4
13.3
Jan-10-2006
51
12.0
7.1
4,320
53.0
14.6
Jan-11-2006
51
11.9
8.2
4,730
58.4
16.2
Jan-12-2006
53
11.4
8.2
4,840
60.8
17.2
Jan-13-2006
52
11.6
8.1
4,870
68.6
19.3
Jan-14-2006
53
11.8
8.1
4,800
67.5
19.2
Jan-15-2006
52
11.3
8.1
4,780
71.4
20.1
Jan-16-2006
50
10.9
9.6
5,130
82.7
22.5
Jan-17-2006
47
10.9
8.0
4,890
74.2
18.9
Jan-18-2006
47
11.1
8.5
4,890
76.2
19.3
Jan-19-2006
48
10.6
8.5
4,970
75.4
19.4
Jan-20-2006
48
10.4
7.8
4,950
74.2
19.1
Jan-21-2006
48
10.5
8.7
4,880
67.7
17.4
Jan-22-2006
44
10.7
8.7
4,870
72.6
17.2
Jan-23-2006
41
10.5
8.7
4,960
78.5
17.3
Jan-24-2006
41
10.7
9.0
4,920
68.2
15.0
Jan-25-2006
44
10.8
8.3
4,980
70.6
16.6
Jan-26-2006
46
11.5
8.5
4,910
70.3
17.3
Jan-27-2006
45
11.3
7.8
4,960
64.3
15.6
Jan-28-2006
44
11.7
7.8
4,800
63.4
15.0
Jan-29-2006
42
12.8
8.0
4,830
63.8
14.6
Jan-30-2006
41
13.1
8.0
4,900
68.7
15.2
Jan-31-2006
42
13.0
7.4
4,920
66.8
15.0
Mean
55
11.5
7.4
4,440
60.7
16.8
Total Acre-feet
3,370
 
 
 
Total (lbs)
521
Load Limitation for January 2006 (lbs)
211