Continuous water monitoring at Station B (discharge from San Luis Drain), January 2003.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
26
10.0
7.1
4,370
57.2
8.0
Jan-02-2003
27
10.4
7.3
4,350
38.9
5.7
Jan-03-2003
24
10.3
7.3
4,430
32.9
4.3
Jan-04-2003
21
10.3
7.4
4,470
31.4
3.6
Jan-05-2003
28
10.8
7.8
4,560
34.6
5.2
Jan-06-2003
26 e
11.2
7.7
4,680
60.8
8.5
Jan-07-2003
28 e
10.5
7.7
4,560
66.7
10.1
Jan-08-2003
28 e
10.1
8.1
4,620
78.5
11.9
Jan-09-2003
23
10.0
8.3
4,770
84.2
10.4
Jan-10-2003
24
10.4
8.4
4,740
90.1
11.7
Jan-11-2003
27
11.0
7.7
4,580
87.7
12.8
Jan-12-2003
27
11.2
8.4
4,700
73.5
10.7
Jan-13-2003
24
11.2
8.0
4,690
69.3
9.0
Jan-14-2003
24
11.6
8.0
4,680
79.8
10.3
Jan-15-2003
23
12.0
7.8
4,700
77.6
9.6
Jan-16-2003
20
11.6
9.1
4,760
78.4
8.5
Jan-17-2003
19
11.4
8.5
4,660
72.7
7.4
Jan-18-2003
15
11.2
8.6
4,600
68.5
5.5
Jan-19-2003
15
10.8
8.5
4,660
69.8
5.6
Jan-20-2003
20
10.4
8.4
4,670
69.4
7.5
Jan-21-2003
20
10.4
8.2
4,570
66.0
7.1
Jan-22-2003
21
10.6
8.0
4,480
51.2
5.8
Jan-23-2003
22
11.4
8.1
4,350
34.4
4.1
Jan-24-2003
23
12.0
7.8
4,370
36.0
4.5
Jan-25-2003
20
11.8
8.9
4,690
32.9
3.5
Jan-26-2003
19
12.1
8.6
4,620
52.3
5.4
Jan-27-2003
18
12.2
8.5
4,620
45.3
4.4
Jan-28-2003
21
12.8
7.5
4,490
41.7
4.7
Jan-29-2003
20
13.2
7.9
4,490
45.5
4.9
Jan-30-2003
24
13.1
7.6
4,500
44.2
5.7
Jan-31-2003
26
13.2
P
4,810
50.7
7.1
Mean
23
11.3
8.0
4,590
58.8
 
Total Acre-feet
1,390
 
 
 
Total (lbs)
224
Load Limitation for January 2003 (lbs)
359