Continuous water monitoring at Station B (discharge from San Luis Drain), September 2002 .

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
48
25.9
6.2
3,690
32.2
8.3
Sep-02-2002
49
26.5
5.8
3,790
32.2
8.5
Sep-03-2002
44
27.0
6.3
3,740
32.4
7.7
Sep-04-2002
43
26.2
6.5
3,820
34.8
8.1
Sep-05-2002
49
24.5
6.0
3,570
30.8
8.1
Sep-06-2002
44
23.7
6.9
4,000
40.3
9.6
Sep-07-2002
42
23.1
7.0
4,210
47.1
10.7
Sep-08-2002
41
22.5
6.1
3,880
44.9
9.9
Sep-09-2002
40
22.5
6.6
3,990
47.6
10.3
Sep-10-2002
36
23.2
5.9
3,930
43.4
8.4
Sep-11-2002
43
23.8
6.6
4,210
51.9
12.0
Sep-12-2002
39
24.2
5.6
3,970
43.6
9.2
Sep-13-2002
30
24.3
7.6
4,760
69.6
11.3
Sep-14-2002
27
24.4
8.1
4,840
66.4
9.7
Sep-15-2002
29
24.4
6.6
3,930
44.1
6.9
Sep-16-2002
31
23.9
5.9
3,620
41.6
7.0
Sep-17-2002
32
23.9
7.1
4,160
50.8
8.8
Sep-18-2002
34
23.7
8.3
4,690
53.9
9.9
Sep-19-2002
28
23.9
9.0
4,990
61.7
9.3
Sep-20-2002
25
24.4
8.3
4,670
64.4
8.7
Sep-21-2002
23
24.7
7.9
4,500
61.1
7.6
Sep-22-2002
25
24.9
7.5
4,250
55.8
7.5
Sep-23-2002
23
25.0
6.8
3,870
47.1
5.8
Sep-24-2002
22
25.0
6.5
3,720
35.2
4.2
Sep-25-2002
21
24.8
7.8
4,290
44.2
5.0
Sep-26-2002
18
24.3
8.0
4,430
44.8
4.3
Sep-27-2002
19
23.3
8.6
4,750
49.5
5.1
Sep-28-2002
22
22.1
8.9
4,840
54.0
6.4
Sep-29-2002
19
21.5
8.8
4,840
67.5
6.9
Sep-30-2002
16
21.6
8.4
4,880
63.6
5.5
Mean
32
24.1
7.2
4,230
48.6
 
Total Acre-feet
1,910
 
 
 
Total (lbs)
241
Load Limitation for September 2002 (lbs)
310