Continuous water monitoring at Station B (discharge from San Luis Drain), July 2002.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
46
27.4
P
4,120
41.8
10.4
Jul-02-2002
52
28.3
P
4,010
37.2
10.4
Jul-03-2002
63
28.0
P
4,370
49.3
16.8
Jul-04-2002
58
27.2
P
4,440
49.5
15.5
Jul-05-2002
58
26.3
P
4,440
54.1
16.9
Jul-06-2002
58
26.0
P
4,390
50.1
15.7
Jul-07-2002
58
25.9
P
4,350
48.5
15.2
Jul-08-2002
60
25.4
P
4,510
54.7
17.7
Jul-09-2002
58
26.3
P
4,540
53.6
16.8
Jul-10-2002
55
27.6
P
4,540
47.2
14.0
Jul-11-2002
58
28.2
P
4,490
51.5
16.1
Jul-12-2002
55
28.3
P
4,330
43.1
12.8
Jul-13-2002
52
28.5
P
4,080
37.1
10.4
Jul-14-2002
53
28.8
P
3,960
39.8
11.4
Jul-15-2002
55
28.4
P
4,100
40.0
11.9
Jul-16-2002
55
27.4
P
4,120
41.9
12.4
Jul-17-2002
54
26.7
P
4,270
45.3
13.2
Jul-18-2002
54
26.4
P
4,180
42.0
12.2
Jul-19-2002
54
26.2
P
4,520
46.1
13.4
Jul-20-2002
55
26.7
P
4,270
37.8
11.2
Jul-21-2002
56
26.6
P
4,150
36.0
10.9
Jul-22-2002
56
26.1
P
4,010
34.0
10.3
Jul-23-2002
53
26.0
P
3,930
33.7
9.6
Jul-24-2002
51
25.8
P
3,920
33.9
9.3
Jul-25-2002
47
25.9
P
3,850
30.8
7.8
Jul-26-2002
46
26.0
P
3,970
32.8
8.1
Jul-27-2002
50
26.5
P
3,900
33.1
8.9
Jul-28-2002
45
26.4
P
3,570
28.7
7.0
Jul-29-2002
43
26.0
P
3,560
27.5
6.4
Jul-30-2002
43
26.0
P
3,510
27.2
6.3
Jul-31-2002
44
26.2
P
3,460
24.1
5.7
Mean
53
26.8
P
4,120
40.4
 
Total Acre-feet
3,260
 
 
 
Total (lbs)
365
Load Limitation for July 2002 (lbs)
429