Continuous water monitoring at Station B (discharge from San Luis Drain), October 2000.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Oct-01-2000
18
25.5
6.6
3,960
49.3
4.8
Oct-02-2000
19
25.8
6.4
3,960
55.0
5.6
Oct-03-2000
19
25.2
7.2
4,430
59.1
6.1
Oct-04-2000
19
24.6
7.4
4,530
53.9
5.5
Oct-05-2000
21
24.4
7.4
4,480
56.4
6.4
Oct-06-2000
21
24.7
6.9
4,350
53.0
6.0
Oct-07-2000
20
24.1
7.0
4,280
51.6
5.6
Oct-08-2000
19
23.4
6.6
4,050
45.4
4.7
Oct-09-2000
17
23.1
6.1
3,820
41.2
3.8
Oct-10-2000
17
21.4
6.1
3,770
39.0
3.6
Oct-11-2000
24
20.3
6.5
3,690
31.3
4.1
Oct-12-2000
34
19.9
5.7
3,450
27.7
5.1
Oct-13-2000
33
20.0
5.7
3,650
26.9
4.8
Oct-14-2000
27
20.4
6.8
4,340
37.6
5.5
Oct-15-2000
25
20.6
7.6
4,710
40.5
5.5
Oct-16-2000
23
20.8
6.4
4,320
62.9
7.8
Oct-17-2000
21
21.2
6.0
4,110
60.3
6.8
Oct-18-2000
20
21.3
5.3
3,750
55.2
6.0
Oct-19-2000
21
21.1
4.9
3,470
38.9
4.4
Oct-20-2000
19
20.9
5.0
3,430
31.0
3.2
Oct-21-2000
17
19.1
5.1
3,460
29.2
2.7
Oct-22-2000
16
15.6
5.2
3,530
26.4
2.3
Oct-23-2000
16
15.6
5.7
3,670
29.8
2.6
Oct-24-2000
17
16.5
6.5
4,090
43.8
4.0
Oct-25-2000
15
16.6
6.6
4,150
39.3
3.2
Oct-26-2000
16
15.7
6.6
4,040
51.6
4.5
Oct-27-2000
19
15.3
6.1
4,040
40.7
4.2
Oct-28-2000
23
15.8
6.1
4,140
43.4
5.4
Oct-29-2000
22
16.0
6.3
4,150
40.5
4.8
Oct-30-2000
21
15.6
6.7
4,140
36.5
4.1
Oct-31-2000
19
15.5
6.4
4,020
30.4
3.1
Mean
21
20.2
6.3
4,000
42.8
 
Total
 
 
 
 
 
146
Load Limitation for October 2000 (lbs)