Continuous water monitoring at Station B (discharge from San Luis Drain), August 2001.

Show explanation of footnotes and agency abbreviations
PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Aug-01-2001
56
26.3
7.1
4,150
42.1
12.7
Aug-02-2001
59
26.3
6.5
3,810
36.9
11.7
Aug-03-2001
55
26.2
6.9
4,180
43.8
13.0
Aug-04-2001
56
26.4
6.8
4,310
48.7
14.7
Aug-05-2001
57
26.5
6.5
4,100
42.2
13.0
Aug-06-2001
61
26.6
6.7
4,040
40.2
13.2
Aug-07-2001
61
27.0
6.2
3,710
34.4
11.3
Aug-08-2001
59
28.1
6.3
3,720
35.7
11.4
Aug-09-2001
56
28.2
5.9
3,540
31.6
9.5
Aug-10-2001
56
27.3
5.5
3,310
25.9
7.8
Aug-11-2001
55
26.4
5.5
3,300
27.7
8.2
Aug-12-2001
51
26.1
5.7
3,530
30.9
8.5
Aug-13-2001
54
25.6
5.8
3,640
33.5
9.8
Aug-14-2001
56
25.4
5.9
3,560
28.2
8.5
Aug-15-2001
59
25.7
6.1
3,680
30.2
9.6
Aug-16-2001
61
26.0
6.1
3,520
34.9
11.5
Aug-17-2001
60
26.4
5.6
3,570
32.0
10.4
Aug-18-2001
58
26.8
5.1
3,330
28.4
8.9
Aug-19-2001
57
26.8
5.5
3,560
31.3
9.6
Aug-20-2001
57
26.1
5.8
3,660
32.8
10.1
Aug-21-2001
56
24.9
5.7
3,570
30.7
9.3
Aug-22-2001
53
24.3
5.9
3,740
35.0
10.0
Aug-23-2001
50
24.2
5.8
3,760
42.7
11.5
Aug-24-2001
52
24.8
6.0
3,900
47.6
13.3
Aug-25-2001
62
25.4
6.1
3,900
44.3
14.8
Aug-26-2001
55
26.0
5.9
3,760
40.0
11.9
Aug-27-2001
52
26.4
5.4
3,640
41.3
11.6
Aug-28-2001
53
26.6
5.2
3,580
43.2
12.3
Aug-29-2001
50
26.5
6.1
3,930
45.1
12.2
Aug-30-2001
54
25.1
6.5
4,240
58.4
17.0
Aug-31-2001
51
24.0
6.7
4,510
56.3
15.5
Mean
56
26.1
6.0
3,770
37.9
Total
353
Load Limitation for August 2001 (lbs)
453