Continuous water monitoring at Station B (discharge from San Luis Drain), April 2001 .

Show explanation of footnotes and agency abbreviations
PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Apr-01-2001
41
20.8
7.8
5,220
89.0
19.7
Apr-02-2001
40
19.0
8.9
5,750
96.2
20.8
Apr-03-2001
41
17.3
8.8
5,740
82.9
18.3
Apr-04-2001
38
16.8
8.7
5,610
79.4
16.3
Apr-05-2001
39
16.9
8.4
5,600
86.0
18.1
Apr-06-2001
38
16.0
8.6
5,670
91.2
18.7
Apr-07-2001
35
15.0
8.4
5,700
96.1
18.1
Apr-08-2001
35
14.8
8.2
5,670
91.8
17.3
Apr-09-2001
35
15.1
7.7
5,230
80.6
15.2
Apr-10-2001
37
15.1
7.6
5,120
78.5
15.7
Apr-11-2001
37
15.5
7.9
5,100
64.4
12.9
Apr-12-2001
38
15.4
8.0
5,130
72.5
14.9
Apr-13-2001
37
16.4
7.8
5,390
86.3
17.2
Apr-14-2001
35
16.9
7.5
5,290
82.1
15.5
Apr-15-2001
34
17.8
7.9
5,510
77.8
14.3
Apr-16-2001
34
18.5
7.7
5,570
86.7
15.9
Apr-17-2001
34
19.3
7.5
5,470
87.6
16.1
Apr-18-2001
34
19.9
7.9
5,510
80.9
14.8
Apr-19-2001
32
19.5
8.2
5,640
83.9
14.5
Apr-20-2001
31
17.6
7.9
5,540
83.7
14.0
Apr-21-2001
33
16.9
7.9
5,440
79.8
14.2
Apr-22-2001
38
17.9
8.1
5,570
88.1
18.1
Apr-23-2001
37
19.1
7.9
5,580
81.4
16.2
Apr-24-2001
33
20.4
7.5
5,310
76.4
13.6
Apr-25-2001
34
22.4
7.5
5,030
71.2
13.1
Apr-26-2001
32
24.2
7.5
5,250
77.1
13.3
Apr-27-2001
37
24.6
7.8
5,320
76.9
15.3
Apr-28-2001
35
24.3
8.7
5,590
86.1
16.3
Apr-29-2001
34
23.5
8.6
5,550
89.6
16.4
Apr-30-2001
36
23.7
7.9
5,210
83.0
16.1
.
.
.
.
.
.
.
Mean
36
18.7
8.0
5,440
82.9
Total
481
Load Limitation for April 2001 (lbs)
679