Continuous water monitoring at Station B (discharge from San Luis Drain), August 1999.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Aug-01-1999
64
25.7
7.7
4,600
47.6
16.4
Aug-02-1999
68
26.0
8.2
4,720
47.4
17.4
Aug-03-1999
70
26.6
8.5
4,850
51.4
19.4
Aug-04-1999
63
26.9
8.2
4,550
51.3
17.4
Aug-05-1999
59
26.2
7.5
4,240
50.0
15.9
Aug-06-1999
59
24.4
7.4
4,010
39.5
12.6
Aug-07-1999
61
23.6
7.8
4,180
39.6
13.0
Aug-08-1999
66
24.1
7.7
4,020
37.4
13.3
Aug-09-1999
67
24.0
7.6
3,960
40.1
14.5
Aug-10-1999
67
24.1
7.4
3,860
34.4
12.4
Aug-11-1999
60
23.8
7.6
3,700
30.8
10.0
Aug-12-1999
56
24.2
6.7
3,850
32.0
9.7
Aug-13-1999
56
24.7
7.1
4,160
35.2
10.6
Aug-14-1999
57
25.2
7.0
4,190
34.8
10.7
Aug-15-1999
60
24.9
6.8
4,000
29.3
9.5
Aug-16-1999
56
24.9
6.7
3,960
31.7
9.6
Aug-17-1999
54
25.6
6.9
4,250
43.2
12.6
Aug-18-1999
56
25.8
6.9
4,100
39.1
11.8
Aug-19-1999
53
25.4
6.6
3,960
34.6
9.9
Aug-20-1999
55
25.6
6.7
4,130
42.9
12.7
Aug-21-1999
58
25.6
6.7
4,120
42.3
13.2
Aug-22-1999
58
26.0
6.5
4,010
38.9
12.2
Aug-23-1999
60
27.0
5.6
3,640
32.3
10.5
Aug-24-1999
67
27.1
5.7
3,540
25.9
9.4
Aug-25-1999
68
27.3
5.4
3,380
24.8
9.1
Aug-26-1999
76
26.8
5.6
3,780
38.6
15.8
Aug-27-1999
81
26.7
6.3
3,800
40.3
17.6
Aug-28-1999
81
26.9
5.8
3,480
38.8
17.0
Aug-29-1999
82
26.8
5.8
3,580
42.9
19.0
Aug-30-1999
73
26.1
6.1
3,670
44.9
17.7
Aug-31-1999
62
23.7
5.7
3,690
50.2
16.8
Mean
64
25.5
6.8
4,000
39.1
 
Total
 
 
 
 
 
418
Load Limitation for August 1999 (lbs)
506